Shouhang Hi-Tech's 100MW ultra-high temperature carbon dioxide heat pump energy storage system is planned to be included in the list of the fourth batch of major technical equipment in the energy field of the National Energy Administration

Time:2024-11-25


On November 22, the General Office of the National Energy Administration issued the "Notice on Publicizing the Fourth Batch of the First Major Technological Equipment in the Energy Field". The "100MW-class ultra-high temperature carbon dioxide heat pump energy storage system" developed by Shouhang Hi-Tech Energy Technology Co., Ltd. and Beijing Frontier Power Technology Co., Ltd. is planned to be included in the list of the fourth batch of the first major technological equipment in the energy field.

 

 

 

Shandong Feicheng 100MW/400MWH New Compressed Carbon Dioxide Molten Salt Energy Storage Project

 

Construction capacity: 100MW/400MWh

Land area: 80 mu

Steam for the park: 400,000 tons/year

Central cooling: 25,000 square meters

Central heating: 100,000 square meters

Current efficiency: Electric-to-electric conversion efficiency ≥ 63%, comprehensive conversion efficiency ≥ 85%

Based on the optimized technical route and the commissioning of new research and development equipment in the later stage, it can be achieved in three to five years: Electric-to-electric conversion efficiency ≥ 76%, comprehensive conversion efficiency ≥ 90%

 

Technical advantages

 

1. Small footprint

2. Low cost per kilowatt-hour

3. Economies of scale

4. Low marginal storage cost

5. Completely independent of geographic location