Waste Heat Power Generation
Waste Heat Power Generation
Shouhang specializes in chain investment, R&D and design, engineering construction and operation management for waste heat power generation project. We provide our clients with engineering construction and technology services which including engineering design and technical consultation, installation and EPC for waste heat power generation project.
|
Huocheng County Lihuo Energy Company Combustion Driving Waste Heat Power Generation 2×25MW Project
• Save 113,400 Tons Of Standard Coal Every Year • Reduction Of 282,500 Tons Of Carbon Dioxide Emissions Per Year • Annual Reduction Of 8,500 Tons Of Sulfur Dioxide Emissions • Annual Reduction Of 4,200 Tons Of Nitrogen Oxides |
|
|
|
The construction scale of Khorgas combustion driving waste heat power generation project is 50MW which is composed of two 25MW units. The operation of the first unit runs well since operation started on 14th June, 2013. If two units are put into operation simultaneously, it is estimated that annual on-grid energy is about 324,000,000 kWh (standard operating hour is 6480 hours). According to the calculation of on-grid energy, 113,400 tons standard coal can be saved every year. The emission of CO2, SO2, NOx and dust can be reduced by 282,500 tons, 8500 tons, 4200 tons and 77,100 tons respectively. |
Related cases
The power generation which uses the off gas of compressor station gas turbine is an effective measure for energy saving and environmental protection. The fuel availability is improved remarkably
Waste Heat Power Generation
Huocheng County Lihuo Energy Co., Ltd. Horgos Gas Flooding Waste Heat Utilization 2 × 25MW Project
Huocheng County Lihuo Energy