Recently, Shouhang High-tech Energy Technology Co., Ltd. (hereinafter referred to as "the company" or "the seller") and China Energy Construction Group Northwest Electric Power Construction Engineering Co., Ltd. (hereinafter referred to as "the buyer") signed the "Tangshan Haitai New Energy Technology Co., Ltd. Photothermal Photovoltaic Integration Project Tower Concentrating Heat System Procurement Contract", the contract stipulates that the seller shall provide contract equipment and services for the buyer Tangshan Haitai Xinneng Technology Co., Ltd. for the photothermal photovoltaic integration project (tower concentrating heat collection system).
This contract belongs to the daily business behavior of the company. According to the company's "Articles of Association", this contract is signed after review and approval by the General Manager's Office. Now the relevant content announcement is as follows:
First, the counterparty introduction.
1. Company Name: Northwest Electric Power Construction Engineering Co., Ltd. of China Energy Construction Group;
2. Legal representative: Cao Donglin;
3. Registered Address: No.3 Changle West Road, Xincheng District, Xi 'an City, Shaanxi Province;
4. Business scope: general contracting of large-scale thermal power, wind power, water power, nuclear energy, solar energy, natural gas, biomass power plants and substations, transmission lines, industrial and civil construction projects; electricity sales business; construction, commissioning, supervision and operation maintenance, management and technical services of civil engineering and installation projects; contracting foreign engineering projects; Dispatch personnel and equipment, materials, commodities and technology import and export of overseas projects; fabrication, processing, installation and maintenance of industrial boilers, pressure vessels, metal structures, electrical instruments, high-pressure pipelines and iron towers; construction of flood control and irrigation facilities, dam filling, roads, bridges, airport runways, well sinking, dynamic compaction, shock flushing, demolition and blasting works; commercial concrete addition; earthwork and foundation treatment; installation, construction, commissioning and indoor and outdoor decoration of building fire fighting facilities; equipment rental; internal staff training; sales of mechanical equipment, mechanical and electrical equipment, lifting equipment, hardware products, electronic products, chemical products (except dangerous and precursor chemicals), mineral products and building materials. (For projects subject to approval according to law, business activities can only be carried out after approval by relevant departments)
5. There is no relationship between the buyer and the Company;
6. The buyer and the Company did not have similar business in the most recent fiscal year;
7. Analysis of performance ability: The counterparty to this contract is a large integrated company with good reputation and good performance ability.
II. Main Contents of the Contract
1, the subject of the contract: Tangshan Haitai New Energy Technology Co., Ltd. photothermal photovoltaic integration project (tower-type concentrating heat collection system) contract equipment and services;
2. Total contract amount (including tax): RMB 428,718,280.00 (in words: four hundred and twenty-two hundred and seventeen hundred and eighty-eight hundred yuan only);
3, settlement method: phased according to the proportion of settlement, as follows:
3.1 advance payment is 10% of the total contract price;
The 3.2 feeding amount is 20% of the total contract price;
The 3.3 payment is 50% of the total contract price;
The 3.4 acceptance payment is 10% of the total contract price;
The 3.5 warranty is 10% of the total contract price.
4. Conditions of entry into force: This contract shall take effect immediately after being signed by the legal representatives (heads of units) or authorized representatives of both parties and stamped with official seals.
5. Term of performance of the contract: This contract agreement shall come into effect after being signed by the legal representatives or authorized representatives of both parties and stamped with the official seal of the unit respectively. After both parties fulfill their obligations under the contract and pay the contract expenses, the contract shall be automatically terminated.
6. Breach of Contract
If one party to the contract fails to perform its contractual obligations, does not perform its contractual obligations in accordance with the agreement or the guarantee made under SA, it shall bear to the other party the liability for breach of contract such as continuing to perform, taking remedial measures such as repair, replacement, return of goods, or compensation for losses.
6.1 Seller's liability for breach of contract
6.1.1 Due to the seller's liability, the performance of the equipment provided fails to meet the performance guarantee value agreed in the contract technical agreement, and the second acceptance test (due to the seller's reasons) still fails to meet one or more guarantee indicators, the seller shall bear the breach of contract.
6.1.2 If, due to the seller's liability, the seller fails to deliver the technical information to the buyer or the design unit designated by the buyer on schedule, the seller shall pay the buyer 500 yuan (RMB) compensation per day for each drawing or each information until the complete drawings or information are provided.
6.1.3 If the buyer's duration is delayed due to the error or negligence of the seller's technical services, the seller shall pay the buyer 1% of the contract price for each week of delay.
6.1.4 After the delivery of the contract equipment, if the buyer's works cannot be put into operation on schedule due to quality problems caused by the seller, the seller shall pay the buyer a breach of contract price of 1% of the contract price for each delay of 1 week.
6.1.5 During the quality assurance period, if the contract equipment is shut down due to defects in the seller's design, materials or manufacturing, the seller shall pay the buyer 2% of the contract price for each outage.
6.1.6 The total amount of compensation for breach of contract shall not exceed 10% of the total contract price.
The impact of 3. contracts on listed companies.
1. The photothermal project signed this time belongs to the company's main business. The signing of this contract is the recognition of the company's technology, core equipment and general contracting capacity by the new energy photothermal power generation market. The signing of this contract is conducive to further enhancing the company's core competitiveness in the new energy solar thermal power generation market and has a positive impact on the company's medium and long-term development.
2, the company has the ability to perform the contract, capital, personnel, technology and production capacity, to ensure the smooth performance of the contract.
3. After the contract comes into effect, the delivery equipment and the implementation of the project shall be arranged according to the schedule of the project, and the specific schedule shall be performed according to the time agreed in the contract and technical agreement. The total contract amount (including tax) accounts for about 65.73 of the company's operating income of 652,205,492.85 yuan in 2022. The implementation of the contract will increase the company's operating income and operating profit in 2024 and 2025.
4, the signing and performance of this contract does not affect the company's business independence. There is no reliance on the other party to the contract as a result of the performance of the contract.
IV. Risk Tips
1, the contract performance cycle is long, there is a risk that the contract can not be performed due to the impact of force majeure risk.
2, the contract payment recovery in stages according to the proportion of implementation, due to the long performance cycle, there is a risk of slow payment recovery, please pay attention to the risk of investors.
3. Steel and glass are the main raw materials of the company's products. The performance cycle of this contract and the production cycle of the product are long, and the operating cost is affected by the price changes of steel and glass during the production cycle. Fluctuations in the price of raw materials may have a favorable or adverse effect on the Company's gross profit amount, thus exposing the Company to the risk of fluctuations in gross profit margin due to fluctuations in the price of raw materials.
V. Contract Review Procedure
This contract is a day-to-day business conduct of the Company and does not require the approval of the Board of Directors of the Company, nor does it require the opinions of independent directors and lawyers.
VI. Documents for Reference
1. The original contract signed by both parties.
It is hereby announced.
Shouhang Gaoke Energy Technology Co., Ltd.
Board of Directors
7 March 2024