Huocheng County Lihuo Energy Co., Ltd. Horgos Gas Flooding Waste Heat Utilization 2 × 25MW Project
Huocheng County Lihuo Energy Co., Ltd. Horgos Gas Flooding Waste Heat Utilization 2 × 25MW Project
Huocheng County Lihuo Energy Co., Ltd. Horgos Gas Flooding Waste Heat Utilization 2 × 25MW Project
The construction scale of the Horgos fuel-driven waste heat utilization project is 50MW, consisting of 2 25MW units. The first one has been put into operation since June 14, 2013 and has been running well. The two units are put into operation at the same time. It is estimated that the annual on-line power consumption is about 0.324 billion kilowatt-hours (standard operating hours are 6480 hours). According to the on-line power consumption, 113400 tons of standard coal can be saved each year, 282500 tons of carbon dioxide, 8500 tons of sulfur dioxide, 4200 tons of nitrogen oxides and 77100 tons of dust can be reduced.

Related cases
Contact information
-
Email:shgk@sh-ihw.com
-
Fax:010-52256633
-
Add:Building 20,Block 3,188 South 4th Ring W.Rd,Fengtai,Beijing,China