Announcement on the Record of Photovoltaic Hydrogen Production Integrated Energy Storage Demonstration Project
Time:2022-03-24
Classification: Company Announcement
Gansu Shouhang Fengguang Hydrogen Energy Co., Ltd., a wholly-owned subsidiary of Shouhang High-tech Energy Technology Co., Ltd. (hereinafter referred to as "the company" or "Shouhang High-tech"), obtained the "Gansu Shouhang Fengguang Hydrogen Energy Co., Ltd. Photovoltaic Hydrogen Comprehensive Energy Storage Demonstration Project" issued by the Reform Bureau on March 22, 2022, the specific contents are as follows:
I. Project Overview
Project Name: Gansu Shouhang Fengguang Hydrogen Energy Co., Ltd. Photovoltaic Hydrogen Comprehensive Energy Storage Demonstration Project
Project (legal entity): Gansu Shouhang Fengguang Hydrogen Energy Co., Ltd.
Project code: 2203-620902-04-05-137085
Construction site: Jiuquan City, Gansu Province
Project Nature: New
Project investment: 63 million yuan
Construction scale and content: the project covers an area of 330 mu, with a 1000 Nm3/h alkaline water electrolysis hydrogen production system and a 6MW intelligent photovoltaic power generation system (not connected to the Internet, only hydrogen production), which directly converts photovoltaic power generation into hydrogen. The power consumption of the electrolysis hydrogen production system is 5MW, and a 1MW/2MWh non-supplementary combustion compressed air energy storage system is constructed. During the period of high power generation load and long power generation time, cooperate with hydrogen production and hydrogen storage system for energy storage; A fixed high-pressure gaseous hydrogen storage tank of 6000Nm with a capacity of 400m ³ will be built.
II. Impact of the Project on the Company
The source of funds for the construction of this project is all its own funds, which will not adversely affect the company's financial and operating conditions, and is in the interests of the company and all shareholders. This project will rely on the company's talent advantages and technical reserves in energy storage technology. After the completion of the project, it will be conducive to the company's scientific research data and technology in related fields such as molten salt heat storage, hydrogen energy storage, compressed air and carbon dioxide energy storage. Accumulation is conducive to enhancing the company's competitive advantage and comprehensive strength, in line with the company's development plan.
III. Risk Tips
1. Before the construction of this project starts, relevant procedures such as planning, environmental protection, safety production, and energy evaluation must be handled in accordance with the law, and there may be risks such as long time for approval by relevant government departments. Investors are advised to pay attention to investment risks.
IV. Documents for Reference
1. Project Filing Form
It is hereby announced.
Shouhang Gaoke Energy Technology Co., Ltd.
Board of Directors
March 23, 2022