Announcement on the signing of joint development and cooperation agreements
Time:2021-03-24
Classification: Company Announcement
On March 23, 2021, Shouhang Gaoke Energy Technology Co., Ltd. (hereinafter referred to as the "Company" or "Shouhang Gaoke") and TBEA Co., Ltd. (hereinafter referred to as "TBEA") signed the "Joint Development and Cooperation Agreement". TBEA plans to develop a solar energy project in Botswana (Botswana) and is closely following the 2*100MW Solar Thermal Power Plant (CSP) project in Botswana (hereinafter referred to as the "Solar Thermal Project"). The owner of the project is expected to launch an international tender this year (2021). The company and TBEA agreed to establish a partnership to jointly prepare and complete the bidding and future market development of the solar thermal power generation project. According to the Articles of Association, the contract was signed after consideration and approval by the General Manager's Office of the Company.
First, the basic situation of the partners.
1. Company Name: TBEA Co., Ltd;
2. Legal representative: Zhang Xin;
3. Domicile: 189 Beijing South Road, Changji City, Changji Prefecture, Xinjiang;
4. Business scope: manufacturing, sales, maintenance, installation and recycling of transformers, reactors, transformers, wires and cables and other electrical machinery and equipment; production and sales of mechanical equipment and electronic products; sales of Wujinjiaodian; silicon and related products Manufacturing, research and development and related technical consultation; processing of mineral products; research and development and consultation of new energy technology, building environmental protection technology, water resources utilization technology and related engineering projects; manufacturing, installation and related technical consultation of solar system components and environmental protection equipment; design, construction, installation and maintenance of solar photovoltaic off-grid and grid-connected and wind-solar complementary systems, diesel light complementary systems and other new energy series projects; design and installation of solar central heating projects; design and manufacture of solar thermal products; contracting overseas electromechanical industry power transmission and transformation, hydropower, thermal power station projects and domestic and international bidding projects, export of equipment and materials belonging to the above-mentioned overseas projects, dispatch of labor personnel required for the implementation of the above-mentioned overseas projects; import of steel products; import and export of general goods and technologies; special-grade qualification for general contracting of electric power engineering construction and Class A qualification in the electric power industry, which can undertake general contracting, general contracting and project management of electric power engineering construction at all levels; can be engaged in the corresponding construction project general contracting business and project management and related technical and management services within the scope of the qualification certificate; house rental; water production and supply (limited to subordinate branches); power supply; heat production and supply; cargo Transportation agency services and related consulting; flowers and plants cultivation, sales.
5. TBEA has no relationship with the Company;
6, the most recent fiscal year TBEA and the Company did not have similar business;
II. Main Contents of the Contract
Whereas, TBEA plans to develop a solar energy project in Botswana (Botswana) and is closely following the 2*100MW Solar Thermal Power Plant (CSP) project in Botswana (hereinafter referred to as "CSP"), which is expected to be launched by the owner this year (2021). The company and TBEA agreed to establish a partnership to jointly prepare and complete the bidding and market development of the solar thermal project. The Parties hereby agree as follows:
1. Principles of cooperation between the two parties
1.Principal of the Partnership
1.1 TBEA, as the project leader, is responsible for collecting bidding information, tracking and controlling the bidding progress of the photothermal project, leading the preparation of bidding documents and other necessary work related to the promotion of the photothermal project.
1.1 TBEA, as the leading party, is responsible for collecting the bidding information, tracking and understanding the bidding progress of the CSP Project, leading the preparation of bidding documents, and other necessary work relating to promoting the CSP Project.
1.2 Shouhang High-Tech is responsible for providing technical advice and services for the photothermal project, and fully supports the provision of relevant technical data required for the bidding and promotion of the photothermal project.
1.2 Shouhang High-Tech is responsible for providing advice and consultation on the understanding of the technical information of the CSP Project, and give full support for obtaining relevant technical data which is necessary for the bidding and promoting of the CSP Project.
1.3 According to this agreement, the partnership between the parties is exclusive and only related to the preparation and bidding of the photothermal project and may not be extended to any other activities.
1.3 The Partnership between the Parties under this Agreement is exclusive, and shall be formed solely relating to the preparation and bidding for the CSP Project and shall not be extended to any other activities.
1.4 Unless otherwise agreed in writing by the parties, nothing in this Agreement shall be construed as creating a joint venture or partnership between the parties.
1.4Unless otherwise agreed in writing between the Parties, nothing in this Agreement shall be construed as establishing joint venture orpartnership liability relationship between the Parties.
The parties to the 1.5 shall bear their own costs and expenses within the scope of their responsibility.
1.5 Each Party shall bear the costs and expenses within its own responsibility.
1.6 During the validity of this agreement, if either party wants to withdraw from the partnership, it shall notify the other party in writing at least 60 days before the bid deadline for the photothermal project. The party that withdraws from the partnership shall not bid for the CSP project on its own, nor shall it participate in the bidding of the CSP project in any form or capacity with any third party.
1.6 During the validity period of this Agreement, if any Party wants to withdraw from the Partnership, it shall notify the other Party in writing at least 60 days before the bid closing date of the CSP Project. The Party withdrawn from the Partnership shall neither bid for the CSP Project by itself nor cooperate with any third party in any form or capacity to participate in the bidding of the CSP Project.
2. Responsibilities of the Parties
2.Responsibilities of Each Party
2.1 TBEA, as the lead developer of the photothermal project, shall:
2.1 TBEA, acting as the lead developer of the CSP Project, shall:
A) liaise with the Botswana Ministry of Mineral Resources, Green Technology and Energy Security, Botswana Power Company (hereinafter referred to as "BPC") and other relevant authorities to obtain project information updates and requirements related to the thermal and solar projects.
A)Keep in touch with the Ministry of Mineral Resources, Green Technology and Energy Security, Botswana Power Corporation (hereinafter referred to as "BPC") and other related departments in Botswana for any CSP Project updates and instructions.
B) Take all necessary means to ensure that Botswana Power accepts the submitted proposal for the thermal and light project and succeeds in winning the thermal and light project through a bankable project proposal.
B)Take all necessary steps to ensure that the CSP Project proposal is accepted by BPC in Botswana for the purpose of successfully winning the CSP Project with bankable proposals.
C) Share project-related documents and information with Shouhang High-Tech in a timely manner.
C)In a timely manner to share the relevant documents and information with Shouhang High-Tech.
D) When necessary, conduct field trips with Shouhang High-Tech.
D)Conduct site visits, together with Shouhang High-Tech, when needed.
E) Responsible for the preparation and submission of the complete set of tender documents, relevant clarifications and other work required for the photothermal project.
E)Be responsible for preparing and submitting the whole set of bidding document, any clarification and other work necessary for the CSP Project.
f) To provide the required funding for the development and implementation of the Photothermal Project under financing terms and conditions acceptable to Botswana and the potential financing institutions, and subject to the approval of the Governments of Botswana and China.
F)Secure fund required for the development and implementation of the CSP Project at the financing term and conditions acceptable to both the Botswana and potential financing institutes and subject to approval from the Governments of Botswana and China.
2.2 Shouhang Gaoke, as the project technical provider, shall:
2.2 Shouhang High-Tech, acting as a technology provider, shall:
A) Provide technical support as a technology developer in accordance with the final requirements of the tender documents. If the tenderer has investment requirements for the technology provider, Shouhang Gaoke shall comply with them.
A)Provide technical support in accordance with the final tender requirements for technology provider. If the Botswana side has investment requirements for the technology provider, Shouhang High-Tech shall comply with them.
B) Assist TBEA in handling the bidding requirements for the technical part of the photothermal project, analyze the technical feasibility and provide technical bidding documents as required.
B)Assist TBEA for the CSP Project technical part, analyses the Technical Feasibility and provide the technical bidding documents as required.
C) Assist TBEA to conduct on-site investigation and technical negotiation, and help TBEA to solve technical problems in the development of the photothermal project.
C)Assist TBEA for the site visit and technical negotiation, help TBEA solve the technical problems in developing the CSP Project.
D) Provide the conceptual design scheme of the whole power plant for the bidding, including the necessary bidding technical services such as optimizing the installed capacity, storage time, heliostat quantity, power calculation, etc.
D)Provide the whole plant conceptual design for bidding, including optimal installed capacity, storage time, heliostats numbers, calculation of production and other necessary technical service work for bidding.
III. Impact of this Agreement on the Listed Company
1, the company has the ability to perform this agreement, capital, personnel, technology and production capacity can ensure the smooth performance of this agreement;
2. After the entry into force of this agreement, the company will form a consortium with TBEA to jointly bid for or develop the Botswana (Botswana) solar thermal power generation project. The company will closely follow the relevant progress of Botswana's 2*100MW solar thermal power plant (CSP) project.
3, overseas photothermal power generation market space is vast, the company is currently actively tracking the progress of a number of overseas photothermal power generation projects. Africa is rich in solar energy resources, which is very suitable for the construction of solar thermal power plants, and is one of the overseas markets that the company focuses on tracking. If the project involved in this agreement can be successfully won, it will provide support for the company's future development of solar thermal power generation projects in Africa.
IV. Risk Tips
1, the agreement for the company and TBEA cooperation in the development of overseas solar thermal project agreement, specific by the project bidding progress, project location approval and other objective factors. The company will be in accordance with the relevant provisions, timely disclosure of the progress of the project, so that the majority of investors pay attention to investment risks.
2. In case of changes in the relevant policies of the project location, there may be a risk that the project investment cannot be promoted on time. Please pay attention to the investment risk.
3. The performance of this Agreement has no material impact on the Company's operating results for the year.
V. Contract Review Procedure
The contract is not subject to review and approval by the Company's Board of Directors, nor is it subject to the comments of independent directors and lawyers.
VI. Documents for Reference
1. Both parties sign an agreement.
It is hereby announced.
Shouhang Gaoke Energy Technology Co., Ltd.
Board of Directors
March 24, 2021