Tower type photothermal power generation_case
On July 28, 2022, the bidding consortium participated by Souhang High-Tech won the EPC general contract of the Three Gorges Energy Qinghai Golmud 100MW CSP project in the 001 bid section.
The total installed capacity of the project is 1100MW: 1000MW CSP power generation project +100MW solar thermal project is one of the sub-projects of the 1.6 million kW CSP project of Haixi Base in Qinghai Province. It is located in the photovoltaic solar thermal Park of Wutumeren, Golmud City, Haixi Autonomous Prefecture, Qinghai Province.


Up to now, the installation of the reserved steel structure platform on the north side of the endothermic tower has been completed, and the installation of the visiting platform outside the tower has been completed;
The heliostats installation is nearly 96% complete, the cable trench excavation has been basically completed, and the cable laying is proceeding as planned;
10% of air cooling island exhaust pipe installation combination has been completed ;
The inspection of hot and cold tank insulation needle welding test has been basically completed.