Dongfeicheng 100MW/400MWH New Compressed Carbon Dioxide Molten Salt Energy Storage Project
Dongfeicheng 100MW/400MWH New Compressed Carbon Dioxide Molten Salt Energy Storage Project
PROJECT FEATURES
1: high technology content
The project adopts the "high temperature molten salt compressed carbon dioxide" energy storage technology, cold-heat-electricity three-in-one supply, and achieves a comprehensive energy utilization rate of 85%. The project was recommended by Shandong Province as the fourth batch of the National Energy Administration in 2024. The recommended list of major technical equipment (sets) has been identified as a key project in Tai'an City.
2: many application scenarios
The project can not only cut the peak and fill the valley for the power grid, but also provide 300000 tons of steam every year, accurately solve the problem of industrial steam sticking in the economic development zone of Feicheng city, and help the construction of a new industrialized strong city.
3: demonstration leading strong
This project is the first energy storage demonstration project in Feicheng Economic Development Zone that does not rely on salt caverns. It can enrich the energy storage technology route in Feicheng Economic Development Zone, lead other energy storage methods to land, and help Feicheng to build a "100 billion-level energy storage capital".
Related cases
Contact information
-
Email:shgk@sh-ihw.com
-
Fax:010-52256633
-
Add:Building 20,Block 3,188 South 4th Ring W.Rd,Fengtai,Beijing,China