Investor Relations
Products and business
Hydrogen Utilization
Hydraulic Technology
White Smoke Elimination
+86 10-52255555
E-mail:shouhang@sh-ihw.com
Fax:+86 10-52256633
Address: No. 20, District 3, Headquarters Base, Fengtai District, Beijing
SHOUHANG HIGH-TECH ENERGY CO.,LTD
京ICP备12002262号-3 Powered by www.300.cn Beijing
Use of excess heat
Inventions and independent intellectual property rights
Huocheng County Lihuo Energy Company Combustion Driving Waste Heat Power Generation 2×25MW project
Huocheng County Lihuo Energy Company Combustion Driving Waste Heat Power Generation 2×25MW project
The construction scale of Khorgas combustion driving waste heat power generation project is 50MW which is composed of two 25MW units. The operation of the first unit runs well since operation started on 14th June, 2013. If two units are put into operation simultaneously, it is estimated that annual on-grid energy is about 324,000,000 kWh (standard operating hour is 6480 hours). According to the calculation of on-grid energy, 113,400 tons standard coal can be saved every year. The emission of CO2, SO2, NOx and dust can be reduced by 282,500 tons, 8500 tons, 4200 tons and 77,100 tons respectively.